Already 1 NikVesti readers have joined the Club. Our goal is 200

We’ve launched the NikVesti Club!
Learn more
Joining the Club is an investment
in truth and journalism
Join now
Your investment  in truth and journalism.   Learn more
  • Saturday

    26 July, 2025

  • 32.1°
    Clear sky

    Mykolaiv

  • 26 July , 2025 Saturday

  • Mykolaiv • 32.1° Clear sky

The power line was disconnected again at the Zaporizhzhia Nuclear Power Plant

The occupied Zaporizhzhia nuclear power plant, photo from open sources The occupied Zaporizhzhia nuclear power plant, photo from open sources

At the temporarily occupied Zaporizhzhia nuclear power plant, one of the lines supplying power to the plant was once again disconnected.

This was reported by «Energoatom».

«Today, May 23, 2024, at 1:31 p.m., the external overhead line PL-750 kV «Dniprovska», connecting the temporarily occupied Zaporizhzhia NPP with the United Energy System of Ukraine, was disconnected. Currently, the largest nuclear power plant in Europe is connected to the Ukrainian power system only by the PL-330 kV Zaporizhzhia TPP — Ferosplavna power transmission line, the message says.

If this line also fails, another complete blackout will occur at the ZNPP, which is a serious violation of the conditions of safe operation of the plant and threatens the development of an accident.

It was previously reported that for the first time since the end of 2022, all six power units of the Zaporizhzhya nuclear power plant, temporarily occupied by the Russians, were put into a «cold shutdown» state.

Read more:

0
Discussion

To join the conversation, please to the NikVesti website.

We’ve launched the NikVesti Club!

Community of readers, who believe in the power of media and change reality through journalism

Our goal is 200
Already 1 NikVesti readers have joined the Club