• Friday

    27 September, 2024

  • 17.2°
    Overcast

    Mykolaiv

  • 27 September , 2024 September

  • Mykolaiv • 17.2° Overcast

Mykolaiv Oblast plans to overhaul the Pervomaisk — Novoukrainka highway: ₴952.8 million was previously spent on it

Screenshot from Google map. Screenshot from Google map.

The Service for Reconstruction and Development of Infrastructure in the Mykolaiv Oblast will spend 11.8 million hryvnias on the production of project documentation for the overhaul of the T-15-04 «Pervomaysk — Novoukrainka» route.

This is evidenced by the data of the ProZorro public procurement system, NikVesti reports.

It is worth noting that the last tender for the current repair of T-15-04 in sections 3+900 — kilometers 29+445 was held in December 2021. The renovation cost 952 million 804 thousand 330 hryvnias (the starting price was 980 million 606 thousand 928 hryvnias). Three companies took part in the bidding, and the winner was Khmelnytskyi ShBU No. 56 PrJSC. Warranty terms are not specified in the draft contract. The works were to be completed by June 30, 2023.

Tender screen from ProZorro. Tender screen from ProZorro.

The new tender deals with the capital repair of the road surface. The length of the highway section is 25,545 kilometers.

The winner of the tender, who will develop the documentation, will be chosen at the auction on January 15, 2024.

Tender screen from ProZorro. Tender screen from ProZorro.

It was previously reported that the Service for Reconstruction and Development of Infrastructure of the Mykolaiv Region plans to repair a part of the state road M-14 «Odesa — Melitopol — Novoazovsk» for 29.8 million hryvnias.

We will remind you that before this, the Service for Reconstruction and Development of Infrastructure of the Mykolaiv Region also announced a tender for the repair of a part of the state road M-14 «Odesa — Melitopol — Novoazovsk». At that time, the customer planned to spend 444 million 342 thousand 191 hryvnias on the 3.3 kilometer long site.

At the same time, it is known that a bypass road is planned to be built near Mykolaiv. Currently, the planned start of the first stage is the construction of an interchange on the M-14 highway.

Read also the article by NikVesti «Billions are needed for reconstruction: how the repair of bridges and roads destroyed by the war in the Mykolaiv Region is proceeding»

Read more: